B1972–POWER LIFTGATE LATCH RELEASE – RATCHET PRIMARY SWITCH PERFORMANCE





For a complete wiring diagram Refer to Section 8W


  • When Monitored:

    Whenever the power liftgate is manually being moved or at full open position, or at the end of a power opening cycle.

  • Set Condition:

    The pawl switch was detected as grounded but the ratchet switch remained open.


Possible Causes
 
(Q901) SENSOR GROUND CIRCUIT OPEN
 
(G78) LIFTGATE AJAR SWITCH SENSE CIRCUIT OPEN
 
(G78) LIFTGATE AJAR SWITCH SENSE SHORT TO VOLTAGE
 
POWER LIFTGATE LATCH
 
POWER LIFTGATE MODULE
 




Diagnostic Test

1.DTC PRESENT

NOTE: This DTC will only set during the releasing operation after the four second time out. This may make it difficult to reproduce.







Does the scan tool display B1972–POWER LIFTGATE LATCH RELEASE - RATCHET PRIMARY SWITCH PERFORMANCE?

Yes
  • Go To2


No

2.BINDING LIFTGATE






Does it take more effort to operate the liftgate than it should?

Yes


No
  • Go To 3

3.POWER LIFTGATE MODULE






Did the scan tool show the switch state changing correctly every time?

No
  • Go To4


Yes

4.CHECK THE (Q901) LOGIC GROUND CIRCUIT FOR AN OPEN








Is the resistance below 9.5 ohms?

Yes
  • Go To6


No

5.(G78) LIFTGATE AJAR SWITCH SENSE CIRCUIT OPEN







Is the resistance below 2.0 ohms?

Yes
  • Go To6


No

6.(G78) LIFTGATE AJAR SWITCH SENSE CIRCUIT SHORT TO VOLTAGE





Is there voltage present?

Yes


No