INSTALLATION

NOTE: When using RTV, the sealing surfaces must be clean and free from grease and oil.
NOTE: When using RTV, parts should be assembled in 10 minutes and tighten to final torque within 45 minutes.

- First: All to 10 N·m (89 in. lbs.).
- Second: All to 22 N·m (195 in. lbs.).
(Refer to 9 - ENGINE/LUBRICATION/OIL PUMP - INSTALLATION)
(Refer to 9 - ENGINE/LUBRICATION/OIL PAN - INSTALLATION)